Exploration and Production

Maintenance/Shutdown Planner / Coordinator (MLNX)

CompanyBaker EnergyExperience6-10 years
Date of posting2008-05-09 14:59Salary indicationCompetitive
CategoryExploration and ProductionStart dateImmediate
RegionAfrica otherDurationTo be agreed
CountryAlgeria
LocationMLN CPF base
DescriptionBaker Energy wishes to recruit a Shutdown Planner/Coordinator who will provide support to the Production Operations for planning and optimisation of shutdown and commissioning of MLNX, based in Algeria.
Responsibilities will include but are not limited to:

• Ensure that highest EHS standard are followed and advise operation management of any concerns.

• Attend simops meetings and shutdown planning meetings as required.

• Review of work pack and make recommendation on Simops suitability.

• Liaise with Project department on efficiency of shutdown planning with a view to period reduction but at no costs to safety.

• Recommend isolation required and equipment needed to make tie ins.

• Review pressure test procedures for tie ins.

• Incorporate any work required by MLN operations into the overall shutdown planning and ensure minimal conflict.

• Liaise with MLN Maint Supt. and Productions supt. on the above.

• Liaise with MLN production Operations readiness advisor.

• Review commissioning planning and assist where possible.

• Liaise with corporate engineering on commissioning and shutdown issues.

• Preparation of Maintenance philosophy for MLNX equipment.

• Give input into spares packages.

• Technical Reports on status of shutdown planning.

• Monthly report.

• Response to shutdown communications.

• Ghant charts as required.
Skills• 10 years of Maintenance planning coordination and background

• Team lead for Entire Shutdown coordination

• Planning from earliest stages of building the business cases for SD through to writing the presentation for SD sponsor approval

• Work pack assembly

• Manpower and material resource identification and scope identification for manpower and material vendors
RemarksRotational 4-4 position with back to back.
Reference Nr001/BE/jlb